Mile Stones

  • 2020

    Total installed power capacity exceeded 10GW

    Cox' Bazar Wind Power Project (66MW) in Bangladesh has been registered with the National Development and Reform Commission and the Ministry of Commerce of the People's Republic of China, and obtained the enterprise overseas investment certificate.

  • 2019

    Energy output hit a record high;

    Profit doubled year on year;

        Listed among China’s top 10 electricity suppliers;

        Certificated as a national hi-tech enterprise.

  • 2018

    Renewable energy installed capacity exceed 1GW.

  • 2017

    Dam Monitoring Center, Renewable Energy Integrated Control Center began operation.

  • 2016

    First two solar power plants(40MW) began operation.

  • 2015

    Wuling has assisted SPIC in acquiring 19 hydro, and wind, power plants in Australia, Brazil, and Chile.

    First two wind power plants(100MW) in Hunan began operation.

  • 2014

    Tuokou Hydropower Plant, the last hydropower plant along the Yuanshui River basin, Tuokou Hydropower Plant was commissioned, indicating the end of the cascading development of Yuanshui River.

  • 2013

    First two wind power plants (99MW) began operation.

  • 2009

    CPID took over the 63% shares of Wuling’s from SPIC.

  • 2004

    Renamed as Wuling Power Corporation Ltd.

  • 2002

    Wuling was incorporated into SPIC Group.

  • 1995

    Authorized by the State Council for the cascading development of Yuanshui River, Hunan Wuling Hydropower Development Co., Ltd. was established.

  • 1994

    Wuqiangxi Hydropower Plant was commissioned.

  • 1987

    Hunan Wuqiangxi Hydropower Engineering Construction Company was established.